Parts needed for this procedure:
| Shaft | 1 |
| Hub | 2 |
| Roll pin | 2 |
Important: This tool is used to align the engine output shaft with the blower shaft; refer to the Service Manual for your machine.
Install the hubs to the shaft as shown in Figure 1.
Insert the pins through the hub and shaft until they contact the opposite side of the hub (Figure 1).
Note: Do not press the pin through the opposite hole in the shaft.
Note: The pins and shaft should move freely through the slot in the hub after assembly.
