Mark the
hydraulic hoses to indicate the hose position.
Disconnect
the hydraulic hoses and plug the hoses. Clean any spilled fluid.
Remove the
hydraulic fittings.
Break loose
the 6 drive hub nuts and bolts. Do not remove them yet.
Remove the
4 bearing nuts and bolts.
Remove the
4 hydraulic–motor mounting bolts.
 |
Warning |
|
Heavy object,
to avoid muscle strain or back injury, use lifting aids and proper
lifting techniques when removing or replacing
heavy objects.
Remove the
bearing, drive hub, and cutter wheel from the grinder frame.
Remove the
6 bolts and nuts from the cutter head and separate the hub from the
cutter wheel on the motor side.
Using a vice,
secure the motor and remove the nut from the cutter head.
Remove the
drive hub from the motor and discard the motor.
Using a vice,
secure the motor and Install the drive hub on to the new motor over
the woodruff key.
Note: If
the new motor does not have a woodruff key, the previous motor key
can be used.
Install the
nut on to the new motor and drive hub. Torque to 339 to 475 N·m (250
to 350 ft-lb).
Assemble
the drive hub, cutter head, bearing, and motor assembly using the
6 previously removed nuts and bolts. Torque to
101 N·m (75 ft-lb) in a star pattern. Ensure that
the cutter head dimples are facing the bearing side.
Install the
cutter assembly on to the machine. Install the motor side first. Ensure
that the grease fitting and the 2 hydraulic
ports on the motor are facing up. Torque the 4 hydraulic motor nuts
to 142 N·m (105 ft-lb).
Install the
4 bearing nuts and bolts. Torque the nuts to 101 N·m (75 ft-lb).
Install the
hydraulic fittings into the motor. Torque the fittings to 136 N·m (100 ft-lb).
Remove the
plugs from the hydraulic hoses and install the hoses on to the hydraulic
fittings. Use a backup wrench to limit hose
twisting. Torque the hoses to 54
to 60 N·m (40 to 44 ft-lb).